Current Projects
HOUGHTON SKYWALK REMOVAL
This project is the removal of 3 walkways that run over the streets of downtown. The project consists of demoing and lifting of heavy 40' long precast Double Tee planks and the reconstruction of all the end points of each walkway.
Click Picture to Enlarge
100 East Sharon Avenue
Houghton, Michigan 49931
t. 906.482.5426
f. 906.482.7001